BroadwayBlue
Well-known member
I was looking at Jason's Marti Report in his gallery and I noticed his build date was the same as mine. Seems our cars traveled together for awhile and were released the same day.
Some things I thought were interesting was that although they were built the same day, 4/30/68. Mine was built 13 days ahead of schedule while Jason's was 13 days behind schedule.
The other thing that I thought was odd, was ... our VIN numbers are pretty far off. There is a difference of 2639. Is it safe to assume that like today a VIN number was assigned well before the car hit the assembly line?
Which would go along with the Marti Report stating that the car is "The 99999th Ford vehicle scheduled for production at San Jose."
Some things I thought were interesting was that although they were built the same day, 4/30/68. Mine was built 13 days ahead of schedule while Jason's was 13 days behind schedule.
The other thing that I thought was odd, was ... our VIN numbers are pretty far off. There is a difference of 2639. Is it safe to assume that like today a VIN number was assigned well before the car hit the assembly line?
Which would go along with the Marti Report stating that the car is "The 99999th Ford vehicle scheduled for production at San Jose."